When we built our carport at the Rock Farm, we knew eventually we would have to do some work on the driveway. The carport has been one of the most useful additions to the liveability of our house – with the shade welcome in summer and the lack of frost a bonus in winter for early morning starts. Building the carport was a challenge (https://rockfarming.com/2019/11/22/making-shade/) however it also created other problems that we knew we would need to address one day.

The access to the carport used a track through the garden that had been formed but not used much for the next 40 years. A large concrete pipe carries the drive over a small gully. The problem is to do with the volume of water that comes down the gully. Normally the gully is dry or barely a trickle, however on occasion it comes in torrents, through the pipe and overflowing across the road. Jo always wanted a babbling brook outside the back door…. perhaps not with all-or-nothing features of this one!

When the water subsides, the damage becomes apparent. Over the past 18 months of regular driveway use and occasional floods, the remaining base has become narrower. An attempt to address some of the drainage was of limited success (https://rockfarming.com/2020/08/31/drainage-trees-cattle-and-some-sad-news/). With the driveway now unsuitable for anything but cars, it was time to call in our neighbour, who happens to have his own bob-cat and excavator business.

Lou is an absolute master of his machines, and made short work placing large concrete blocks to form a wingwall on both sides of the driveway. The laser dumpy level helped ensure the blocks were all on the same plane – making the job far neater and more precise than I could have achieved for a fraction of the time.

The last job for us to do was to install the headwall. For this I enlisted some school holiday labour. The boys were in a word fantastic, and were soon mixing the concrete to a perfect consistency. They learnt some important skills, and I really enjoyed the time working with them on this little mud pie project.

Lou also dropped a load of large recycled concrete over the boggy section – making our driveway a far safer all weather proposition…. well except for the last run up the hill to the house. But that will be a job for another day 🙂

We are thrilled with the change to the driveway. Whilst it still isn’t finished properly, it provides far better access to the house for all vehicles, including RFS tankers. A special thanks to Lou for his mastery of his machinery and the school holiday helpers.

Advertisement

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.